New Campus Colegio Lincoln
Santo Domingo, Heredia
Developer: Asociación Institución de Cooperación Educacional Colegio Lincoln
Design: FSA Ingeniería & Arquitectura
Contract: Administration
Term: 13 months
Year: 2007
Description: New campus
Area:205K ftm2
Blue Valley School
Escazú, San José
Developer: B.V.S. S.A.
Design: Ortuño & Urbina Arq.
Contract: Fixed price
Term: 6 months
Year: 1996 y 1998
Description: Classrooms buildings and outbuildings.
Area: 38K ft2
Universidad Latina Facultad de Medicina
San Pedro, San José
Developer: Fundación para el Desarrollo de las Ciencias y las Letras
Design: Arq. Javier Vargas
Contract: Administration
Term: 6 months
Year: 2000
Description: Finishes for the School of Medicine.
Area: 94K ft2
Catedral de Limón
Limón, Limón
Developer: Asociación de Amigos de la Catedral de Limón S.A.
Design: DYPSA
Contract: Administration PMG
Term: 12 months
Year: 2003
Description: Catholic church
Area: 18K ft2
Consultorios Médicos Cima (II Etapa)
Escazú, San José
Developer: PINMSA
Design: Construcciones y Diseños Trejos Facio
Contract: Fixed price
Term: 9 months
Year: 2007
Description: Medical tower.
Area: 51K ft2
Hospital Cima San José y Torre Médica
Escazú, San José
Developer: Hospital San José S.A.
Design: HED-Heriel
Contract: Administration PMG
Term: 20 months
Year: 2000 y 2005
Description: Hospital and medical towers.
Area: 205K ft2
Templo Mormón
Belén, Heredia
Developer: Iglesia de Jesucristo de los Santos de los Últimos Días
Design: PIASA Consultores
Contract: Fixed price
Term: 13 months
Year: 2000
Description: Mormon temple
Area: 15K ft2
Centro de Control de Energía ICE
Santo Domingo, Heredia
Developer: ICE, Instituto Costarricense de Electricidad
Design: ICE, Instituto Costarricense de Electricidad
Contract: Lump sum
Term: 19 months
Year: 2017
Description: 3 level building.
Area: 118K ft2
Unidad Productiva Pérez Zeledón
Pérez Zeledón, San José
Developer: Unidad Ejecutora del Proyecto. Contrato No. 2526/OC-CR. BID-Ministerio de Justicia
Design: OBP
Contract: Unit price
Term: 9 months
Year: 2017
Description: Detention unit, medical center, gymnasium.
Area: 59K ft2
Unidad Productiva Pococí
Pococí, Limón
Developer: Unidad Ejecutora del Proyecto. Contrato No. 2526/OC-CR. BID-Ministerio de Justicia
Design: OBP
Contract: Unit price
Term: 12 months
Year: 2017
Description: Detention unit, medical center, gymnasium.
Area: 108K ft2
Facultad de Ingeniería Universidad de Costa Rica
San Pedro, San José
Developer: Universidad de Costa Rica
Design: Universidad de Costa Rica
Contract: Fixed price
Term: 17 months
Year: 2018
Description: Classroom building and administrative building.
Area: 361K ft2
Universidad Nacional
Heredia, Heredia
Developer: Universidad Nacional
Design: Universidad Nacional
Contract: Fixed price
Term: 13 months
Year: 2018
Description: Artistic and sporting complex.
Area: 161K ft2
Texas Tech University Costa Rica for Edulink
Escazú, San José
Developer: Edulink S.A.
Design: Liberman Arquitectos
Contract: Fixed price
Term: 7 months
Year: 2018
Description: University, 3 level building. Classrooms, laboratories and cooking classroom.
Area: 40K ft2
Universidad Latina de Costa Rica
San Pablo, Heredia
Developer: Universidad U Latina SRL
Design: Gensler
Contract: Fixed price
Term: 11 months
Year: 2019
Description: 5 buildings with classrooms and offices.
Area: 162K ft2
UCIMED
San José, San José
Developer: UCIMED, Universidad de Ciencias Médicas
Design: Arq. Rodrigo Escalante
Contract: Fixed price
Term: 8 months
Year: 2012
Description: New Campus
Area: 97K ft2
INA San Ramón
San Ramón, Alajuela
Developer: Instituto Nacional de Aprendizaje
Design: PIASA Consultores
Contract: Fixed price
Term: 13 months
Year: 2020
Description: 4 classroom and training buildings, 1 gym building, 2 laboratory workshops.
Area: 85K ft2
Edificio Corporativo CSMMN Funeraria El Magisterio
San José, San José
Developer: Corporación de Servicios Múltiples del Magisterio Nacional
Design: Rojas Arquitectos & Asociados S.A.
Contract: Lump sum
Term: 9 months
Year: 2021
Description: 2 buildings. 3 levels and 1 basement. Mortuary with veil chapels, morgue and offices.
Area: 49K ft2
UNA Pérez Zeledón
Pérez Zeledón, San José
Developer: Universidad Nacional de Costa Rica, UNA
Design: Universidad Nacional de Costa Rica, UNA
Contract: Unit price
Term: 12 months
Year: 2022
Description: Academic and service building, cafeteria, university square, parking, collection center and wastewater treatment plant.
Area: 55,000 ft2